The system be down for regular maintenance on April 3rd, 2024 from 8:00-10:00am.
Search
Now showing items 1-1 of 1
High-Performance Bridge Systems for Lifeline Corridors in the Pacific Northwest
(2015)
This report contributes to the development of three key strategies for increasing the seismic resilience of bridges, accelerating their construction, extending their lifespan, and decreasing life-cycle costs. The strategies considered were (1) precasting reinforced concrete columns, (2) constructing columns with concrete ...