Drilled Shaft Socket Connections for Precast Column in Seismic Regions

ResearchWorks/Manakin Repository

Search ResearchWorks


Advanced Search

Browse

My Account

Statistics

Related Information

Drilled Shaft Socket Connections for Precast Column in Seismic Regions

Show simple item record

dc.contributor.advisor Stanton, John F en_US
dc.contributor.author Tran, Hung Viet en_US
dc.date.accessioned 2012-09-13T17:32:23Z
dc.date.available 2012-09-13T17:32:23Z
dc.date.issued 2012-09-13
dc.date.submitted 2012 en_US
dc.identifier.other Tran_washington_0250O_10252.pdf en_US
dc.identifier.uri http://hdl.handle.net/1773/20739
dc.description Thesis (Master's)--University of Washington, 2012 en_US
dc.description.abstract Conventional cast-in-place method in bridge construction requires long on-site construction time and substantial labor in the field, which can result in high construction costs and traffic delays. Using precast bridge elements is one solution. However, achieving good connections between precast elements is challenging, particularly in seismically hazardous areas, like the Pacific Northwest, in which the largest forces are developed at the beam-to-column or column-to-footing connections. Therefore, the connections need to be strong enough to resist seismic excitation and easy to construct with high quality. This study adapts the column-to-foundation socket concept to connections between a precast column and cast-in-place drilled shaft. In this connection, the column is precast with a roughened outer surface at the bottom of the column, where it will be embedded in the drilled shaft. Two specimens were fabricated and tested at the University of Washington. The only difference between the two specimens was the amount of spiral reinforcement in the column-to-shaft transition region, which was reduced by half in the second specimen. The goal was to promote failure in the shaft transition region in the second specimen, in order to develop an understanding of the load transfer mechanism there. The response and mode of failure of each specimen was the same as had been anticipated during design. It shows that the new design provides agencies a good method for accelerating bridge construction. en_US
dc.format.mimetype application/pdf en_US
dc.language.iso en_US en_US
dc.subject bridge; drilled shaft; precast column; rapid construction; seismic; socket connection en_US
dc.subject.other Civil engineering en_US
dc.subject.other Civil engineering en_US
dc.title Drilled Shaft Socket Connections for Precast Column in Seismic Regions en_US
dc.type Thesis en_US
dc.embargo.terms No embargo en_US


Files in this item

Files Size Format View
Tran_washington_0250O_10252.pdf 6.408Mb PDF View/Open

This item appears in the following Collection(s)

Show simple item record