The system be down for regular maintenance on April 3rd, 2024 from 8:00-10:00am.
Search
Now showing items 1-2 of 2
An investigation of contaminant distribution in subsurface marine wood waste at Mill-A South Terminal, Port of Everett, Washington
(2016-06)
This project investigates the correlation between contaminants and the wood waste present in marine sediments off the shore of the Port of Everett in the former Weyerhaeuser Mill-A pulp mill site. The investigation includes the results of two field studies, which tested contaminant levels in 22 boreholes as well as several ...
A Phase I and Phase II Environmental Site Assessment of Langus Riverfront Park, Everett, Washington
(2016-12)
The smelting process in older smelters resulted in the release of heavy metals and oxides into the air. Remediation has begun at a former smelter site in Everett, Washington. The site has seen extremely high levels of arsenic and lead in the soil. Surrounding areas tested have also shown high levels of these contaminants. ...