The system will be down for regular maintenance from 8:00-10:00am PDT on April 3rd, 2024.
Search
Now showing items 1-1 of 1
Gasification of in-Forest Biomass Residues
(2013-07-25)
Described is a laboratory-scale continuous-feed supercritical water gasification (SCWG) system. The system is operated using real-world Ponderosa Pine sawmill residues at high biomass loadings, short mean residence times (2-5 sec), and 27.7 MPa pressures. Each run with the SCWG system typically processed several 100 g of ...