Schaufelberger, JohnAghazarian, Gayane2013-04-172013-04-172013-04-172012Aghazarian_washington_0250O_10208.pdfhttp://hdl.handle.net/1773/22602Thesis (Master's)--University of Washington, 2012This research presents a comparison of the work flow and time spent on the paper based construction handover and COBie format process prescribed at the construction phase.application/pdfen-USCopyright is held by the individual authors.BIM; Building Information Model; COBie; Construction; Handover; InformationManagementInformation technologybuilt environmentA Comparative Analysis of Construction Operation Information Exchange Via Paper-based Systems and COBie Format: A Case Study of The First COBie Pilot Project at University of WashingtonThesis