<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-11-22T22:11:13Z</responseDate><request verb="GetRecord" identifier="oai:digital.lib.washington.edu:1773/57009" metadataPrefix="dim">https://digital.lib.washington.edu/server/oai/request</request><GetRecord><record><header><identifier>oai:digital.lib.washington.edu:1773/57009</identifier><datestamp>2026-08-12T10:09:48Z</datestamp><setSpec>com_1773_4888</setSpec><setSpec>col_1773_19677</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="advisor">Abdel Aziz, Ahmed M</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="author">Ccarita Cruz, Miriam</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2026-08-11T19:19:40Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued">2026-08-11</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="submitted">2026</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="other">CcaritaCruz_washington_0250O_29810.pdf</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">https://hdl.handle.net/1773/57009</dim:field>
   <dim:field mdschema="dc" element="description">Thesis (Master&amp;apos;s)--University of Washington, 2026</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract">Early Termination Provisions (ETPs) are core risk-management and governance mechanisms in Public–Private Partnership (PPP) contracts. They specify the circumstances under which a 
project agreement may be terminated before its contractual term expires, the procedures to 
follow, and the resulting consequences. Although leading institutional guidance addresses ETPs, 
its treatment is dispersed across mandates, drafting styles, and levels of procedural detail. 
Therefore, a coherent benchmark is needed to assess how ETPs are structured, articulated, and 
implemented in executed PPP contracts. This research develops and applies a benchmark 
framework for analyzing ETPs in highway PPP contracts, using qualitative content analysis and 
a case-study approach in two phases. The first phase reviews guidance documents and model 
contract materials from five institutions: the World Bank, the United Nations Commission on 
International Trade Law (UNCITRAL), the European PPP Expertise Centre (EPEC), the Inter
American Development Bank (IDB), and the U.S. Federal Highway Administration (FHWA). 
The analysis identifies five core ETP categories: private partner default, contracting authority default, voluntary termination, force majeure, and uninsurability. Each category is examined 
through three dimensions: circumstances and triggers, process, and consequences. These findings 
are translated into category-specific benchmark flowcharts. The second phase applies the 
benchmark to sixteen executed highway PPP agreements from Canada and the United States. 
Each agreement is analyzed to identify the termination categories present and to compare its 
contractual structure with the benchmark. The findings show that executed agreements generally 
reflect the core logic of institutional guidance while adapting ETPs to the lifecycle stage, 
financing structure, jurisdiction, risk allocation, and approval requirements. Overall, ETPs 
operate as staged, process-based, and last-resort mechanisms. The resulting frameworks provide 
public authorities with a concrete reference for ETP design and review in PPP contracts.</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso">en_US</dim:field>
   <dim:field mdschema="dc" element="rights">none</dim:field>
   <dim:field mdschema="dc" element="subject">Early Termination Provisions</dim:field>
   <dim:field mdschema="dc" element="subject">Highways PPPs</dim:field>
   <dim:field mdschema="dc" element="subject">Institutional Guidance</dim:field>
   <dim:field mdschema="dc" element="subject">PPP agreements</dim:field>
   <dim:field mdschema="dc" element="subject">Public-Private Partnerships</dim:field>
   <dim:field mdschema="dc" element="subject">Risk Allocation</dim:field>
   <dim:field mdschema="dc" element="subject">Transportation</dim:field>
   <dim:field mdschema="dc" element="subject">Law</dim:field>
   <dim:field mdschema="dc" element="subject">Management</dim:field>
   <dim:field mdschema="dc" element="subject" qualifier="other">Construction management</dim:field>
   <dim:field mdschema="dc" element="title">Early Termination Provisions in Highways Public-Private Partnerships - Benchmark Framework and Implementations</dim:field>
   <dim:field mdschema="dc" element="type">Thesis</dim:field>
   <dim:field mdschema="dc" element="embargo" qualifier="terms">Restrict to UW for 1 year -- then make Open Access</dim:field>
   <dim:field mdschema="dc" element="embargo" qualifier="lift">2027-08-11T19:19:40Z</dim:field>
   <dim:field mdschema="others" element="access-status">embargo</dim:field>
</dim:dim>