Climate-Specific Life-Cycle Cost Analysis of Different HVAC Systems

dc.contributor.advisorBender, William
dc.contributor.authorJin, Xiuqing
dc.date.accessioned2017-05-16T22:10:37Z
dc.date.issued2017-05-16
dc.date.submitted2017-03
dc.descriptionThesis (Master's)--University of Washington, 2017-03
dc.description.abstractThe buildings sector consumes 41.1% of U.S. primary energy, and HVAC system accounts for the major part of building energy consumption. Each type of building has its occupancy schedule and operation preference, and different climate zones offer a broad range of temperature, humidity, wind and solar conditions. When selecting HVAC systems for a new project, designers and engineers should calculate a proper size of the heating and cooling equipment; owners want to know the initial cost and the life-cycle cost of the different options; contractors also need to have a good understanding of HVAC systems to complete the project with a higher quality. This research involves eQUEST Energy Modeling and Life-Cycle Cost Analysis to compare the energy performance and the overall cost efficiency of different HVAC systems in various climate zones based on a typical educational office building. The selected systems are Variable Air Volume (VAV) Reheat system, Chilled Beam system, Air Source Heat Pump (ASHP) system, and Ground Source Heat Pump (GSHP) system. The four climate zones are Miami (FL), Phoenix (AZ), Seattle (WA) and Spokane (WA). The goal of this research is to illustrate a way of selecting the most suitable HVAC system for a project in the specific climate condition. This will be accomplished by using eQUEST Energy Modeling software and developing Life-Cycle Cost Analysis. The life-cycle cost includes the system capital cost, energy cost, system maintenance and replacement cost over a 20-year of life span. The life-cycle cost analysis provides the Present Value (PV) of annual cost and the life cycle cost, and it compares the accumulated cash flow curves of the sixteen models.
dc.embargo.lift2018-05-16T22:10:37Z
dc.embargo.termsRestrict to UW for 1 year -- then make Open Access
dc.format.mimetypeapplication/pdf
dc.identifier.otherJin_washington_0250O_16919.pdf
dc.identifier.urihttp://hdl.handle.net/1773/38544
dc.language.isoen_US
dc.rightsnone
dc.subjectAccumulated Cash Flow Curve
dc.subjectBuilding Energy Modeling
dc.subjectClimate Zones
dc.subjecteQUEST
dc.subjectHVAC systems
dc.subjectLife-Cycle Cost Analysis
dc.subjectEngineering
dc.subjectEnergy
dc.subjectManagement
dc.subject.otherConstruction management
dc.titleClimate-Specific Life-Cycle Cost Analysis of Different HVAC Systems
dc.typeThesis

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Jin_washington_0250O_16919.pdf
Size:
7.91 MB
Format:
Adobe Portable Document Format