A Comparative Analysis of Construction Operation Information Exchange Via Paper-based Systems and COBie Format: A Case Study of The First COBie Pilot Project at University of Washington

dc.contributor.advisorSchaufelberger, Johnen_US
dc.contributor.authorAghazarian, Gayaneen_US
dc.date.accessioned2013-04-17T18:03:10Z
dc.date.available2013-04-17T18:03:10Z
dc.date.issued2013-04-17
dc.date.submitted2012en_US
dc.descriptionThesis (Master's)--University of Washington, 2012en_US
dc.description.abstractThis research presents a comparison of the work flow and time spent on the paper based construction handover and COBie format process prescribed at the construction phase.en_US
dc.embargo.termsNo embargoen_US
dc.format.mimetypeapplication/pdfen_US
dc.identifier.otherAghazarian_washington_0250O_10208.pdfen_US
dc.identifier.urihttp://hdl.handle.net/1773/22602
dc.language.isoen_USen_US
dc.rightsCopyright is held by the individual authors.en_US
dc.subjectBIM; Building Information Model; COBie; Construction; Handover; Informationen_US
dc.subject.otherManagementen_US
dc.subject.otherInformation technologyen_US
dc.subject.otherbuilt environmenten_US
dc.titleA Comparative Analysis of Construction Operation Information Exchange Via Paper-based Systems and COBie Format: A Case Study of The First COBie Pilot Project at University of Washingtonen_US
dc.typeThesisen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Aghazarian_washington_0250O_10208.pdf
Size:
2.47 MB
Format:
Adobe Portable Document Format