Abstract
Early Termination Provisions (ETPs) are core risk-management and governance mechanisms in Public–Private Partnership (PPP) contracts. They specify the circumstances under which a
project agreement may be terminated before its contractual term expires, the procedures to
follow, and the resulting consequences. Although leading institutional guidance addresses ETPs,
its treatment is dispersed across mandates, drafting styles, and levels of procedural detail.
Therefore, a coherent benchmark is needed to assess how ETPs are structured, articulated, and
implemented in executed PPP contracts. This research develops and applies a benchmark
framework for analyzing ETPs in highway PPP contracts, using qualitative content analysis and
a case-study approach in two phases. The first phase reviews guidance documents and model
contract materials from five institutions: the World Bank, the United Nations Commission on
International Trade Law (UNCITRAL), the European PPP Expertise Centre (EPEC), the Inter
American Development Bank (IDB), and the U.S. Federal Highway Administration (FHWA).
The analysis identifies five core ETP categories: private partner default, contracting authority default, voluntary termination, force majeure, and uninsurability. Each category is examined
through three dimensions: circumstances and triggers, process, and consequences. These findings
are translated into category-specific benchmark flowcharts. The second phase applies the
benchmark to sixteen executed highway PPP agreements from Canada and the United States.
Each agreement is analyzed to identify the termination categories present and to compare its
contractual structure with the benchmark. The findings show that executed agreements generally
reflect the core logic of institutional guidance while adapting ETPs to the lifecycle stage,
financing structure, jurisdiction, risk allocation, and approval requirements. Overall, ETPs
operate as staged, process-based, and last-resort mechanisms. The resulting frameworks provide
public authorities with a concrete reference for ETP design and review in PPP contracts.
Description
Thesis (Master's)--University of Washington, 2026